our 24 meter boom pump pumped 390 m3 over 3 visits on an new industrial unit site in Dumfries. We did this with a combination of using pipe line and pouring straight of the boom.

our Putzmeister line pump pumped 30 m3 for a ring beam foundation in Livingston, utilising our line pumps compact size for this tight site.
our trained operators professionally moved the pipes around the foundation for our customer leaving them to lay the concrete!

our 24 meter boom pump, pumped 40m3 for a project just outside of Alloa for a loading bay at a distillery. The compact size of our 24 meter boom pump makes it easy for us to set up on tight access sites.

Our ground line pump was used for this project in Glasgow city centre due to its compact size and low noise out put, meant it was perfect for this Job. We had multiple visits to this site, 2 of which was on the first floor which meant having yo put our pipeline up through a window to gain access!

For this project we used our 24 meter boom pump to place concrete into shuttering and raft foundation. on our first visit we did around 250 cube the followed by smaller pours.

This project had 10+ visits over the space of 5 months using out 24 meter overhead boom pump we were pumping on average around 180 cube of concrete per visit.


Listers Concrete Pumping